Green Target Engineering

COMPLETED OVER 1500 PROJECTS AND COUNTING

Legal Basement Permit Drawnings– Brampton

Developed a compliant basement unit with separate entrance and egress, meeting Ontario Building Code and municipal requirements.

Outcome

Fast-track approval within 2–3 weeks.

Commercial Projects Permit Drawings – Toronto

Prepared permit drawings for a retail unit including layout, HVAC, and fire safety systems in full code compliance.

Outcome

Permit approved in the first review cycle with no major revisions.

Architectural Design – Brampton

Designed a code-compliant basement layout with efficient space planning and life safety considerations.

Outcome

Successfully approved with a clean and efficient design layout.

Mechanical Design – Mississauga

Prepared HVAC design including heat-loss calculations, duct layout, and equipment sizing in code compliance.

Outcome

Approved in the first review cycle with optimized system efficiency.

Electrical Design – Toronto

Designed electrical systems including lighting, power distribution, and emergency systems as per code requirements.

Outcome

Permit approved without revisions and ready for construction.

Multi-Storey Building – Toronto

Prepared permit drawings for a mixed-use building with coordinated architectural, structural, and MEP systems.

Outcome

Successfully approved with coordinated drawings and minimal revisions.

Do you want to get an estimation?

Get a free estimation of your construction sites.
Feel Free to call us.

Shopping Basket